A small break of warm and clear weather, after the major storm cycle, let multiple teams summit early this week. A climbing ranger climbed on Saturday morning and reported 'great-for the end of the season-conditions' on the DC. Climbing rangers at Camp Schurman had a similar report about the Emmons/Winthrop route.
End of season operations are underway. Helicopter flights for refilling propane tanks and human waste removal occurred last week over the mountain. Stairs to the half-doors on the public shelter are being put in place and the solar dehydrating toilets at Camp Muir will be closed. The larger ADA compliant vault toilet with a half-door will be opened at Camp Muir for use during the winter.
Be sure to double check registration requirements for the dates of your climb. The transition from summer registration regulations to winter registration regulations has begun. See the regs. link to the right for more info.